A report on the review completed by the CAA under Stage 7 of the Airspace Change Process, the Post Implementation Review (PIR), of the implementation of the modified Route 5 RNAV-1 Standard Instrument Departure at Gatwick Airport. The report sets out the framework within which the review has been conducted and details the data that has been analysed in order to reach the conclusions on whether the minor modification of the Route 5 design is a better replication than that achieved by the original Route 5 RNAV-1 SID implemented in November 2013.

Annex A: Route 5 Modified RNAV-1 SID Track Analysis has been published alongside this report.