The CAA has completed the PIR of the Introduction of New Runway Threshold for Runway 33 and Associated Changes to Instrument Approach Procedures airspace change proposal and is summarised in CAP 2176.
As a result of our assessment, the CAA has concluded that the Introduction of New Runway Threshold for Runway 33 and Associated Changes to Instrument Approach Procedures PIR does show that the proposal has been implemented and operated as expected and the CAA is satisfied that the changes are now confirmed.
The CAA’s airspace change process for the Introduction of New Runway Threshold for Runway 33 and Associated Changes to Instrument Approach Procedures airspace change request implemented on 6th February 2014 has now concluded.
As a result of our assessment, the CAA has concluded that the Introduction of New Runway Threshold for Runway 33 and Associated Changes to Instrument Approach Procedures PIR does show that the proposal has been implemented and operated as expected and the CAA is satisfied that the changes are now confirmed.
The CAA’s airspace change process for the Introduction of New Runway Threshold for Runway 33 and Associated Changes to Instrument Approach Procedures airspace change request implemented on 6th February 2014 has now concluded.
- Status:
- Current
- Review comment:
- -
- Version:
- 1
- Version date:
- 07-Mar-2022
- View file:
This publication features in the following categories.
Provide page feedback
Please enter your comments below, or use our usual service contacts if a specific matter requires an answer.
Fields marked with an asterisk (*) are required.