The CAA commissioned the Eurocontrol Performance Review Unit to provide technical external support to the Palamon investigation. This document is the Eurocontrol’s report to the CAA containing its assessment of NERL delays in the London Approach service.
- Status:
- Current
- Review comment:
- -
- Version:
- 1
- Version date:
- 17-Sep-2020
- View file:
This publication features in the following categories.
Provide page feedback
Please enter your comments below, or use our usual service contacts if a specific matter requires an answer.
Fields marked with an asterisk (*) are required.