The CAA has completed the PIR of the Greater Wash and Humber Gateway Transponder Mandatory Zones (TMZ) airspace change proposal and is summarised in CAP 1794
As a result of our analysis, the CAA has concluded that the the Greater Wash and Humber Gateway Transponder Mandatory Zones (TMZ) PIR does show that the proposal has been implemented and operated as expected.
The CAA’s airspace change process for the Greater Wash and Humber Gateway Transponder Mandatory Zones (TMZ) airspace change request implemented on 1 May2014 and 13 October 2016 has now concluded.
As a result of our analysis, the CAA has concluded that the the Greater Wash and Humber Gateway Transponder Mandatory Zones (TMZ) PIR does show that the proposal has been implemented and operated as expected.
The CAA’s airspace change process for the Greater Wash and Humber Gateway Transponder Mandatory Zones (TMZ) airspace change request implemented on 1 May2014 and 13 October 2016 has now concluded.
- Status:
- Current
- Review comment:
- -
- Version:
- 1
- Version date:
- 30-Mar-2020
- View file: