Under its licence, NERL has to report its plans in respect of Transition Altitude and the implementation of the terminal airspace redesign under the London Airspace Management Programme. This decision puts back the dates these reports are required from 31 December 2015 to 30 June 2016.
- Status:
- Current
- Review comment:
- -
- Version:
- 1
- Version date:
- 18-Dec-2015
- View file:
This publication features in the following categories.
Provide page feedback
Please enter your comments below, or use our usual service contacts if a specific matter requires an answer.
Fields marked with an asterisk (*) are required.