Other Gatwick monitoring documents
- Gatwick Airport Limited operator determination (January 2014)
- Economic regulation at Gatwick from April 2014 - notice granting the licence (February 2014)
- Market power determination in relation to Gatwick Airport - statement of reasons (January 2014)
More information on the market power assessment and the initial licence conditions (including the commitments) are on the Airport market power assessment and Gatwick price control pages accordingly.
Operational resilience at Gatwick airport
GAL is obliged to produce an operational resilience plan under its licence. Documents relating to the requirement are below:
- Gatwick - additional guidance for operation resilience plans required under Condition C1 of the licence and Condition 7 of Gatwick Airport Conditions of Use (September 2014)
- Gatwick - consultation on additional guidance for operational resilience plans (July 2014)
- Review of operational resilience at Heathrow and Gatwick - report by Steer Davies Gleave (July 2014)
Service quality at Gatwick
GAL pays rebates to airlines if its service quality does not reach specific standards. Details of its performance against the standards are on the Gatwick airport website.
- Audit of service quality regulation at Gatwick, Grant Thornton (CAP1564)
Provide page feedback
Please enter your comments below, or use our usual service contacts if a specific matter requires an answer.
Fields marked with an asterisk (*) are required.