The table below gives an overview of the delivery elements that structure the delivery plans set out in Part 2 and (in due course) Part 3 of the Airspace Modernisation Strategy (AMS).
There are nine elements arranged under two headings: aircraft-based navigation and airspace management. The 15 initiatives from the 2018 AMS, delivery of which will continue, are subsumed into these nine elements.
More information is in AMS Part 2 and the linked database.
Category | AMS delivery elements | 2018 AMS initiatives further developed through these elements |
|
Aircraft-Based Navigation | UK-ABN/1. Trajectory-based operations | 2, 7, 8, 11, 14 |
Overarching principle: implementing government policy on minimising the environmental impacts of aviation within the context of supporting |
UK-ABN/2. Terminal airspace redesign | 4, 5, 14 | ||
UK-ABN/3. Network management | 3, 6 | ||
UK-ABN/4. Integration | 3, 9, 10, 11 | ||
Airspace Management | UK-AM/5. Airspace management | ||
UK-AM/6. Data services | 13, 15 | ||
UK-AM/7. Future surveillance and spectrum | 11, 12 | ||
UK-AM/8. Integration of communications, navigation, surveillance & spectrum | 12, 13, 14, 15 | ||
UK-AM/9. Aircraft capabilities | New |
Notes:
Initiative 1 (Direct Route Airspace) in the 2018 AMS is complete. More detail on delivery elements UK-ABN/1 to /4 and UK-AM/5 to /9 is shown in AMS Part 2 and the linked database.
More detail on the 15 initiatives from the 2018 AMS is in the annual AMS progress reports.
Provide page feedback
Please enter your comments below, or use our usual service contacts if a specific matter requires an answer.
Fields marked with an asterisk (*) are required.