Sponsor: Future Airspace Strategy VFR Implementation Group (FASVIG)
This FASVIG proposal was submitted to raise the base of Airway Q41 from Flight Level 35 to Flight Level 55 along the portion of the Airway between the reporting points published as THRED and ORTAC that runs along the route from the Isle of Wight to the Channel Islands. Raising the base of the airway releases controlled airspace to be re-defined as Class G while improving safety for aircraft operating along and adjacent to this busy route.
Last updated: 15/11/2023
Sponsor's Release of Controlled and Segregated Airspace proposal (date received by CAA) | 12 Oct 2016 |
Operational assessment by CAA | 2 Dec 2016 |
Decision document (CAA change approval) | 22 Feb 2017 |
Change implementation date | 25 May 2017 |
AIRAC distribution date / AIP amendment | 13 Apr 2017 |
PIR Data Request | 09 Nov 2023 |
Provide page feedback
Please enter your comments below, or use our usual service contacts if a specific matter requires an answer.
Fields marked with an asterisk (*) are required.