Sponsor: Cardiff International Airport Limited (CIAL)
The proposal aims to replicate, as closely as possible, current aircraft approach tracks through the use of new RNAV Instrument Approach Procedures (IAPs). The intention is to introduce new procedures that enable aircraft to fly the existing tracks more accurately, at similar speeds and heights.
Last updated: 20 October 2017
Decision document (CAA change approval) |
21 Dec 15 |
Change implementation date | 26 May 2016 |
AIRAC distribution date / AIP amendment | 13 Oct 16 |
CAA PIR assessment | 19 Oct 17 |
Provide page feedback
Please enter your comments below, or use our usual service contacts if a specific matter requires an answer.
Fields marked with an asterisk (*) are required.